Among the 5 best mountain residential projects of all Costa Rica...
- Land size: Lots available from 1,000 M2 (Quarter acre.) to 5,202 M2 (1.28 Acre)
This project is located in Ciudad Colon on the west sector of San Jose, less than an hour from the Pacific Ocean, 20 minutes from the International Airport, 15 minutes from Escazú, and 10 of the best shopping malls, schools and service centers in Costa Rica.
This development has 81 lots of lush natural beauty with measurements that start at 10,000 square feet to the 56,000 square meters. You can also enjoy one of the most beautiful Club House with pool, tennis court, and a nature reserve with trails and natural waterfall.
Complex features:
- A single main gated entrance with a guarding post: That guarantees security and tranquility to the residents and visitors, with 24-hour private security and access control in the guarding post.
- Perimeter wall, guaranteeing security. The project is surrounded by a wall built with block that is 500m long and 2.5 mts up to 3 mts of height.
- Concrete internal roads. The internal roads of the condominium were built of concrete, 15 cm wide. This will enable the roads to support heavy-vehicle transit, and also guarantee the road’s quality and finishing for a long time.
- Electricity: Every property in the condominium has a subterranean electrical supply built according to the technical specifications content in the Engineering Studies issued by the Compañía Nacional de Fuerza y Luz (CNFL).
- Telephone: Each property has telephonic supply by given by a subterranean private telephonic distribution web, built according to the technical specifications issued by the Instituto Costarricense de Electricidad (ICE). Each lot has availability up to 5 telephonic pairs, which need to be solicited to the Condominium Administration.
- Cable TV and Internet, both provided by the same reliable company
- Potable water system: An outstanding characteristic of the project is its potable water system, because it has a perforated well and a tank of 16.475 gallons (or 62.275 litters), guaranteeing enough supply for the residents. Every trimester the water is subject to strict controls of potability to ensure that the water consumed is 100% potable.
- Telemetric system: This system is an auto sufficient and computerized system, reconfigurable and scalable, with information and electric backup systems. It is made up with radio equipment, computer systems, antennas, solar panels, backup batteries, sensors and auto-close automatic valves. The system works with a central computer that controls the well water levels, the water demand, and estimates the consuming rate in order to manage the supply of the main tank. Activates and deactivates the pumping machines and if necessary, it could even open the municipal water valve.
- Contractors: The project has been built with the best equipment and materials in order to offer a high quality product in matter of infrastructure, technology and construction.
Contact Us Now!!! - Click Here